A little more progress today. Mounted the transmission and driveshaft, new distributor, spark plugs, spark plug wires, new fuel injectors, mounted the fuel rail, and installed the power steering pulley. The following day we installed the water pump and pulley and intake manifold/throttle body and the new valve cover rails and gaskets provided from Morana Racing.
Saturday, March 7, 2020
Subscribe to:
Post Comments (Atom)
Paint came out really nice. Couple of small flaws that aren’t extremely noticeable but all in all it came out very nice. Proceeding with rea...
-
Starting to piece the frame back together with some new parts and some parts that we could salvage and clean up before reinstalling. Still ...
-
Once we finally had the frame completely stripped we sent it off to our powder coater to be sand blasted down to the bare metal and sent in ...
-
After months of searching we finally located a 1st generation Ranger in fairly straight condition for the cool price of $700. This has been ...










No comments:
Post a Comment